About the Project
Project Name | Construction Work for the Siirt-Pervari Road Between Km: 3+280 – 8+441 (G)/12+275 (I) – 38+620 and Km: 56+000 (G)/0+000 (I) – 32+600 Sections |
Project Owner | KARAYOLLARI GENEL MÜDÜRLÜĞÜ |
Contract Date | 01.08.2022 |
Info | Our project, which is designed in two sections between Siirt and Pervari, is located on the route that will connect Asia and Europe, aimed at expanding the global trade network. It is 64 km long and includes 2 viaducts, 10 bridges, and many other structures. |