44th Year

Siirt-Pervari Road Construction Work

About the Project

Project NameConstruction Work for the Siirt-Pervari Road Between Km: 3+280 – 8+441 (G)/12+275 (I) – 38+620 and Km: 56+000 (G)/0+000 (I) – 32+600 Sections
Project OwnerKARAYOLLARI GENEL MÜDÜRLÜĞÜ
Contract Date01.08.2022
InfoOur project, which is designed in two sections between Siirt and Pervari, is located on the route that will connect Asia and Europe, aimed at expanding the global trade network. It is 64 km long and includes 2 viaducts, 10 bridges, and many other structures.

Project Location

Account details will be confirmed via email.